STREET LIGHTING
Mberengwa Rural District Council wants 31 solar street lights at 1000W and 2 high-mast tower lights supplied, installed and commissioned at Mberengwa Centre over 60 days. Bids close 6 October 2026 at 12:00 CAT.
A street lighting installation at Mberengwa Centre, in two parts: 31 solar street lights at 1000W, and 2 high-mast tower lights — all supplied, installed and commissioned. Commissioning being explicitly in scope is worth noting: you are responsible for the lights working, not just standing. The high-mast towers are the demanding half. High-mast lighting means substantial foundations, a raise-and-lower headframe assembly, and lifting equipment on site — a different job from planting street light poles, and one that needs engineering design for the bases. The listing says detailed specifications are attached, but they were not published. So the pole heights, battery capacities, panel sizes, lux levels and foundation requirements are all in a document you need before pricing. The 1000W figure on the street lights describes the fixture only, and on solar units the battery and panel sizing is where the cost sits. Bid validity is 120 days, the longest on this board, and the period is 60 days. This is competitive bidding, so expect a full technical submission. The full tender document was not available where we read this, so download it from the source before quoting.
High effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 5 Oct 2026, 10:17.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.