Solar System for On-Air Studio
Broadcasting Authority wants 3 solar systems for on-air studios at Marondera, Rusape and Gutu — each a 6.2kVA 48V inverter, 2 × 100Ah batteries, 12 × 450W panels, protection kit and rails, installed and transported — in 20 days. Bids close 24 September 2026 at 13:00 CAT.
Three solar systems for on-air studios, for the Broadcasting Authority of Zimbabwe, at Marondera, Rusape and Gutu. Each system: a 6.2kVA 48V inverter, two 100Ah batteries, twelve 450W 34V solar panels or equivalent, and a protection kit with rails and accessories. Installation and transport to Marondera, Rusape and Mupandawana are included. The delivery period is 20 days, project funded, with quotations valid for 60 days. It runs under the Competitive Bidding Method. The full tender document was not available to us — download it from the source before quoting.
High effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 23 Sept 2026, 11:23.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.