CONSTRUCTION OF FIRE STATION
Ruwa Local Board wants a fire station built — a 550sqm office block with ablutions and a 10.5m x 14m steel shade at 6m height — in 50 days with a bid security of 2,000. Bids close 6 September 2026 at 20:00 CAT.
Construction of a fire station for Ruwa Local Board on a fix and supply basis, to attached design drawings. The schedule gives real dimensions: an office block with ablutions at 550 square metres floor area, and a steel shade at 10.5m x 14m with a height of 6 metres. The delivery period is 50 days with 30-day bid validity. The full tender document was not available to us — only the notice fields above were published where we can read them, and the design drawings are attached to it.
High effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 6 Sept 2026, 18:44.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.