SUPPLY, DELIVERY AND INSTALLATION OF 1 X 10M3 ABOVE GROUND TANK,INSTALLATION OF PUMP,CONSTRUCTION OF HARDSTANDING FORECOURT,OIL SEPARATOR AND PUMP SHADE
Fidelity Gold Refinery wants a 10 000-litre above-ground fuel tank supplied and installed at Mberengwa with pump, hardstanding forecourt, oil separator and pump shade. Bids close 28 September 2026 at 10:00 CAT.
Fidelity Gold Refinery is buying a complete small fuel installation at Mberengwa on a request for quotation, funded internally. The scope is one 10m3 (10 000-litre) above-ground tank supplied, delivered and installed; a dispensing pump installed; a hardstanding forecourt constructed; an oil separator; a pump shade; plus calibration and dipsticks. This is civil works and mechanical installation together, not a tank supply. The delivery period is 10 days and quotations must hold for 30 days. The full tender document was not published where we can read it, so this is written from the eGP listing alone. Download the document from eGP before quoting.
High effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 28 Sept 2026, 08:32.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.