INSTALLATION OF 5KVA SOLAR SYSTEM EQUIPMENT AT GMB MT HAMPDEN
AFC Holdings wants installation only of a 5kVA solar system at GMB Mt Hampden — Must 48V hybrid inverter, 100Ah lithium battery, 6 × 550W panels, mounting and protection kits and all cabling — within 7 days. Bids close 4 September 2026 at 10:00 CAT.
Installation of a 5kVA solar system at GMB Mt Hampden for AFC Holdings. The notice is explicit that this is **installation only** — the equipment list describes what will be installed, not what the bidder supplies. The system: one Must 48V hybrid inverter, one Must 100Ah lithium battery, 6 × 550W solar panels, a galvanised mounting kit, a protection kit, installation sundries, 3 of 25mm single core red cable and 3 black, 20 of 6mm single core DC cable red and 20 black, and 10 of 2.5mm three-core flex. The work runs over 7 days, funded from internally generated funds, quotations valid 30 days. The full tender document was not available to us — download the RFQ from the source before quoting, and settle who supplies what first.
Moderate effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 4 Sept 2026, 01:16.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.